Plumbing
on: 8/4/2026At first glance after the workers left, I didn’t see much, except for a lot of plastic draped over almost everything in the kitchen. I figured it had been mostly paint prep since I had seen the painting crew caulking the trim and stuff. Then I remembered that the plumber had been here, turning off the water main a couple of times, so I took another look. I don’t know how I missed it. Faucets were installed in the kitchen and bathroom. The shower plumbing was installed, and the toilet returned to its proper place.




I also saw that the drawers in the walk-in closet have been painted.
